Menu
LinksTravel information
More informationImprintPrivacyInformation on accessibility
Languages
German|DeutschEnglish|English
© Deutsche Bahn AG
Störungskarte
Back to overview
Construction site
Rheinfelden(Baden) ⇄ Erzingen(Baden) and Stühlingen/Weizen: train cancellations and replacement bus services
RE 3RB 30RB 37
+0
Disruption period
From:Sa.2026-04-25, 22:00 To:We.2027-06-30, 21:59
Affected
Waldshut — Lauchringen, Rheinfelden(Baden) — Erzingen(Baden), Lauchringen — Weizen
Effect
Rail replacement service

Disruption description
📅 Sunday, April 26, 2026 to mid-2027

Affected lines:

  • RE 3 (Friedrichshafen - Basel Bad Bf)
  • RB 30 (Basel Bad Bf - Lauchringen)
  • RB 37 (Waldshut - Weizen)

Train cancellations and replacement services with buses: Rheinfelden(Baden) ⇄ Waldshut ⇄ Erzingen(Baden) or Stühlingen/Weizen

  • Bus A (purple) = Rheinfelden ⇄ Erzingen(Baden)
    • with stop in Bad Säckingen, Waldshut
  • Bus B (blue) = Rheinfelden(Baden) ⇄ Waldshut
    • with stop in Bad Säckingen
  • Bus C (orange) = Rheinfelden(Baden) ⇄ Waldshut
    • with stops in Beuggen, Schwörstadt, Wehr-Brennet, Bad Säckingen, Murg, Laufenburg, Laufenburg Ost, Albbruck, Dogern, Waldshut Krankenhaus, Waldshut
  • Bus D (green) = Waldshut ⇄ Erzingen(Baden)
    • with stop in Tiengen(Hochrhein)
  • Bus E (red) = Waldshut ⇄ Erzingen(Baden)
    • with stops in Tiengen(Hochrhein), Lauchringen West, Lauchringen, Grießen
  • Bus F (yellow) = Waldshut ⇄ Stühlingen/Weizen
    • with stops in Tiengen(Hochrhein), Lauchringen West, Lauchringen, Wutöschingen, Ofteringen, Untereggingen, Stühlingen, Weizen

Buses in school transport:

  • Bus C (orange)
    • Rheinfelden(Baden)/Bad Säckingen/ Albbruck ⇄ Waldshut Chilbiplatz
    • Waldshut ⇄ Bad Säckingen Gloria Theater ⇄ Rheinfelden(Baden)
  • Bus E (red)
    • Waldshut Chilbiplatz ⇄ Erzingen(Baden)
  • Bus F (yellow)
    • Waldshut Chilbiplatz ⇄Weizen

Alternative stops: Please note the different stops in Rheinfelden, Bad Säckingen and Waldshut. You can find the respective alternative stops directly in the travel information.

Changes available in the digital journey planner: ✅

Reason for the construction work: Electrification and double-track extension of the Hochrheinbahn line

To avoid missing any changes at short notice, please check the digital travel information media at bahn.de or in the DB Navigator app immediately before you start your journey. You can obtain important information for your journey here by selecting the relevant station. Please note that the stops for replacement services are not always located directly at the relevant stations.

🚳 For reasons of space and safety, it is not possible to take bicycles on the buses.

Attachments
Replacement timetable Waldshut - Weizen from 26.4.2026 (DE) (PDF, 64 KB)Timetable Schaffhausen - Basel from 26.04.2026 (DE) (PDF, 196 KB)Passenger brochure Hochrhein from 26.4.2026_web (DE) (PDF, 3 MB)
Links
All DB Regio Baden-Württemberg replacement stops (DE) Directly to the travel information (DE)
Updated on March 25, 2026, 12:26DB Regio Baden-Württemberg