Menu
LinksTravel information
More informationImprintPrivacy
Languages
German|DeutschEnglish|English
© Deutsche Bahn AG
Störungskarte
Back to overview
Construction site
Bad Cannstatt <> Waiblingen, Bad Cannstatt <> Esslingen (N), Bad Cannstatt <> Stuttgart Hbf: train cancellations and replacement services with buses
S 2S 3
+0
Disruption period
From:Tu.2026-02-24, 00:30 To:We.2026-03-25, 00:30
Affected
Stuttgart-Bad Cannstatt — Fellbach, Fellbach — Waiblingen
Effect
Massive Impairment

Disruption description
In the Stuttgart-Bad Cannstatt area, DB is continuing the work for the future digital train operation from last December. The following restrictions will apply:

Tuesday, 24.02., 1.30 a.m. until Wednesday, 25.03.2026, 1.30 a.m

  • The S-Bahn trains on line S2 are canceled between Bad Cannstatt and Waiblingen.
  • The S-Bahn trains on line S3 are canceled between Bad Cannstatt and Fellbach.
  • As a replacement:
    • Buses on the S2E line between Bad Cannstatt, Bahnhof, Pos. 3 and Waiblingen, Dammstraße with stops in Nürnberger Straße, Sommerrain and Fellbach
    • S2X buses between Bad Cannstatt, Bahnhof, Pos. 2. and Waiblingen, Dammstraße without intermediate stops
    • Buses on line XEV between Stuttgart Hbf, Arnulf-Klett-Platz, Pos. 3. and Waiblingen, Dammstraße without intermediate stop

Please note:

  • On the nights of 2/3 March, 3/4 March and 4/5 March 2026, from 10 p.m. to 4.30 a.m. in each case, there will be further restrictions and replacement bus services on lines S1-S6. Please refer to the separate construction site reports on our operating situation page.
  • From Saturday, March 7, 1.30 a.m. to Wednesday, March 11, 1.30 a.m., the S-Bahn trains on line S2 between Filderstadt and Bad Cannstatt and the S3 between Flughafen/Messe and Bad Cannstatt will be cancelled. As a replacement, S-Bahn trains on construction site line S24 will run every 30 minutes between Filderstadt and Marbach(N) via Stuttgart Hbf (low). The replacement service with buses on line S2E Waiblingen - Bad Cannstatt will be extended from and to Stuttgart Hbf. Please note the separate construction site reports on our operating situation page.
  • From Saturday, February 28, 1.30 a.m. to Wednesday, March 11, 2026, 1.30 a.m., there will also be stop cancellations and replacement bus services on the S1 line between Bad Cannstatt and Esslingen(N). Please note the separate construction site reports on our operating situation page.
  • From Tuesday, 24.02., 1.30 a.m. to Wednesday, 25.03.2026, 1.30 a.m., the S-Bahn trains on line S4 between Marbach(N) and Backnang will be canceled due to detour in long-distance and regional traffic. Buses will run between Marbach(N) and Backnang as a replacement (line S4E). Please note the separate construction site reports on our operating situation page.

Please take these deviations into account when planning your journey and find out about your travel connections in advance. To avoid missing any last-minute changes, please also check the digital travel information media at bahn.de or in the DB Navigator app immediately before setting off.

Attachments
Timetable replacement service S2X_24.02.-24.03.pdf (DE) (PDF, 43 KB)Timetable replacement service S2E_07.-11.03.pdf (DE) (PDF, 57 KB)Timetable replacement service S2E_24.02.-7.3._11.3.-24.3.pdf (DE) (PDF, 42 KB)
Links
Further information (DE)
Updated on February 13, 2026, 14:26S-Bahn Stuttgart