Menu
LinksTravel information
More informationImprintPrivacyInformation on accessibility
Languages
German|DeutschEnglish|English
© Deutsche Bahn AG
Störungskarte
Back to overview
Construction site
Basel Bad Bf ⇄ Waldshut: train cancellations and replacement bus services
RB 30
+0
Disruption period
From:Mo.2026-03-30, 20:00 To:Sa.2026-04-25, 03:00
Mondays to Fridays - from 22:00 to 05:00.
Affected
Basel Bad Bf — Waldshut
Effect
Rail replacement service

Disruption description
📅 Monday, March 30 to Saturday, April 25, 2026 (Monday to Friday from 10 p.m. to 5 a.m.)

Affected line:

  • RB 30 (Basel Bad Bf - Lauchringen)

Train cancellations and replacement bus services: Basel Bad Bf ⇄ Waldshut (not all trains affected)

Please note that bus timetables differ from train timetables.

Replacement stops: Basel Bad Bf Bussteig B, Grenzach Sparkasse, Wyhlen Hebelschule, Herten Ecke Bahnhofstr./Gottlieb-Daimler-Str., Rheinfelden(Baden) Busbahnhof, Beuggen Bahnhof, Schwörstadt Feuerwehrhaus, Wehr-Brennet Bahnhof, Bad Säckingen Busbahnhof, Murg(Baden) Bahnhof, Laufenburg(Baden) Sparkasse, Laufenburg(Baden) Ostbahnhof Einkaufszentrum, Albbruck Bahnhof, Dogern Linde, Waldshut Busbahnhof Bussteig 1

Changes available in the digital journey planner: ✅

⚠️ Please note that there will also be restrictions on the following days (see separate announcements):

  • Monday, March 23 to Sunday, March 29, 2026 (all day)
  • Sunday, April 26, 2026 to mid-2027

Reason for the construction work: Preparatory work for the electrification of the High Rhine

In order not to miss any last-minute changes, please check the digital travel information media at bahn.de or in the DB Navigator app immediately before setting off. Here you can obtain important information for your journey by selecting the respective station. Please note that the stops of the replacement services are not always located directly at the respective stations.

🚳 For reasons of space and safety, it is not possible to take bicycles on the buses.

Attachments
Timetable Basel - Waldshut 30.3. to 25.4.2026 (10-5 p.m.) (DE) (PDF, 62 KB)
Links
To the message from March 23 to March 29, 2026 (DE) Directly to the travel information (DE) To the message from April 26, 2026 to mid-2027 (DE) All DB Regio Baden-Württemberg replacement stops (DE)
Updated on March 26, 2026, 10:47DB Regio Baden-Württemberg