Menu
LinksTravel information
More informationImprintPrivacyInformation on accessibility
Languages
German|DeutschEnglish|English
© Deutsche Bahn AG
Störungskarte
Back to overview
Construction site
Stuttgart-Vaihingen <> Stuttgart Hbf: train cancellations and replacement services with buses
S 1S 2S 3
+0
Disruption period
From:Fr.2026-04-10, 23:20 To:Mo.2026-04-13, 02:00
Affected
Stuttgart-Vaihingen — Stuttgart Hbf, Stuttgart Hbf — Stuttgart-Bad Cannstatt
Effect
Trip cancellations

Disruption description
From Saturday, 11.04., 1.20 am to Monday, 13.04.2026, 4.00 am, work will be carried out on the control and safety technology between Stuttgart-Vaihingen and Stuttgart Schwabstraße. The following restrictions will apply:
  • Trains on the S1 line only run between Herrenberg and Stuttgart-Vaihingen as well as Stuttgart Schwabstraße and Kirchheim(T).
  • Trains on the S2 line only run between Filderstadt and Stuttgart-Vaihingen and between Stuttgart Hbf (above) and Schorndorf.
  • Trains on the S3 line only run between Bad Cannstatt and Backnang.
  • Trains on the S1-S3 line only run every 30 minutes.
  • Substitute bus service (SEV1) between Stuttgart Hbf, Arnulf-Klett-Platz, Pos 3. and Stuttgart-Vaihingen, ZOB, Bussteig 1.

Please take these deviations into account when planning your journey and find out about your travel connections in advance. To avoid missing any last-minute changes, please also check the digital travel information media at bahn.de or in the DB Navigator app immediately before setting off.

Attachments
Timetable replacement service SEV1 11-13.04.2026.pdf (DE) (PDF, 269 KB)
Links
Further information (DE)
Updated on March 26, 2026, 14:49S-Bahn Stuttgart